Skip to content
Matt Chung
  • Home
  • About me
  • Photos
  • Posts
  • Speaking Engagements

Tag: critical path

Advanced Operating Systems/Notes

Distributed Systems – Latency Limits (Notes)

Posted on October 20, 2020 by Matt Chung

Introduction Summary Lamport’s theories provided deterministic execution for non determinism exists due to vagaries of the network. Will discuss technique...

About me

Matt Chung
Matt Chung
Empathetic bridger of tech workers to their purpose, self, and community.

Subscribe

Follow Me

  • Instagram
  • Twitter
  • LinkedIn

Featured Posts

Leaps of faiths
“Is my service up and running?” Canaries to the ...
A letter from my future self: “Dear 2019 Matt”
3 tips on getting eyeballs on your code review

Categories

Tags

acid aos project 1 atomicity barrier synchronization being a father bomb breakpoints cache cache coherence carnegie checkpoint computer science concurrency deadlock distributed systems failure gdb inode invariant l1 cache lab learning series libvrt map reduce mellon memory coordinator memory virtualization omscs on call operations openmp page fault paxos rpc semantics sequential consistency state tradeoffs trade offs transaction tree data structure two phase commit protocol two_phase_commit undo record virtual private number window of vulnerability

Archives

Copyright 2020 Matt Chung (not sure how copyright even works but I see everyone else doing it ...)